Top Pic
The 'Fern Pit Cafe' Tidal Footbridge
The first Footbridge across The Gannel
The Ferry operates between May and September , when the Footbridge is also open.
On a low tide in October - the closed Footbridge , missing a few planks , is just visible above a full river.
SW 7906 6124
------------------------------------------
Lower Pic
The Tidal 'Gannel Footbridge'
The second Footbridge across The Gannel
SW 7992 6101
----------------------------------------------------------------------
Ref: 5301.02
Date: 03/10/2017